Most water damage events look dry long before the structural assemblies actually are. A room that smells fine and feels dry to the touch may have framing at 25-30% moisture content — well above the 6-12% target range required for true structural drying. COS Water Damage Restoration's Union structural drying program is driven by daily psychrometric readings, not visual judgment.
The difference between structural drying done right and structural drying done fast is what ends up in your walls three months later.
Low-grain refrigerant (LGR) dehumidifiers operate more efficiently in the low-humidity conditions created by an active drying program than conventional dehumidifiers — achieving lower dewpoint conditions that accelerate evaporation from structural materials. Our Union structural drying crews deploy properly sized LGR equipment based on the specific volume and material profile of your affected assemblies. Equipment sizing is calculated, not estimated.
Every active drying project in Union receives a daily psychrometric reading session: temperature, relative humidity, specific humidity, grains per pound of moisture in the air, and moisture content readings at fixed sensor points in each structural assembly. These readings are logged and provided as documentation of the drying program for your insurance claim. Drying is declared complete only when readings at all sensor points fall within the target EMC range for the material species being dried.
Wall cavity drying is where most post-loss mold in Union properties originates. It's where we focus.
Insurance-formatted drying documentation means faster settlement and fewer adjuster callbacks.
Here are the specific drying scenarios and assembly types our Union team is equipped and trained to handle.
The most common drying failure in Union water damage projects is a wall framing cavity left with elevated moisture content after surface materials are dry. Our Union team uses calibrated cavity access — typically 1-inch drill holes at the base of the wall framing cavity — to introduce directed airflow from high-velocity air movers into the stud bay, paired with LGR dehumidification to extract the evaporated moisture. Moisture readings at framing sensor points confirm completion. Access ports are patched and filled after the program completes, typically leaving no visible trace of the access procedure.
Subfloor assemblies — OSB or plywood sheathing over floor joists — and hardwood flooring systems require targeted drying approaches because of their density and their tendency to cup, buckle, or swell when dried too aggressively or left wet too long. Our Union drying crew evaluates hardwood flooring species and moisture content before recommending drying-in-place versus removal, and when drying in place is appropriate, we use floor drying mats that direct conditioned air against the top face of the hardwood under controlled pressure — accelerating evaporation while minimizing the differential drying stress that causes cupping.
Crawlspace drying in Union properties is complicated by limited access, typically poor natural ventilation, and the presence of vapor barriers that may trap moisture against wood framing. Our Union below-grade drying team is equipped with compact high-velocity air movers that fit through standard crawlspace access hatches, portable LGR units configured for below-grade operation, and moisture meters suitable for sub-surface readings at joist and beam locations. Vapor barrier condition is evaluated and re-secured after drying if disturbed during the process.
Water that migrates down from an upper floor or a roof intrusion in a Union property saturates ceiling drywall and the framing above it — areas that are impossible to reach with standard floor-level equipment. Our Union team installs ceiling injection ports and directs positive-pressure airflow through ceiling cavities, combined with LGR dehumidification of the affected room air space. Ceiling drywall that cannot be dried to target moisture content is removed — rather than left to become a mold substrate — and documented in the scope for replacement.
Large water events in Union commercial or multi-family properties may affect dozens of rooms across multiple floors — requiring coordinated equipment staging, airflow balancing between spaces, and readings management across a large number of sensor points simultaneously. Our Union commercial drying team uses scaled equipment deployment and a project management approach that tracks readings and equipment across the full property footprint, adjusting equipment placement and settings daily based on the reading data from each zone.
Every active structural drying program in Union is also a mold prevention program — because the conditions that support mold growth (elevated moisture content in organic materials and elevated relative humidity in the air space) are exactly the conditions a drying program is designed to eliminate. Our daily reading sessions include assessment of the ambient RH and temperature conditions in each drying zone against the threshold conditions that support mold colonization. If readings suggest an elevated mold risk — particularly in projects where extraction was delayed — we address it proactively with targeted antimicrobial treatment during the active drying program.


Before one piece of drying equipment is placed, our Union team completes a full moisture mapping session using FLIR thermal imaging and calibrated pin-type and non-penetrating meters. The map documents all affected assemblies, saturation levels, and the extent of moisture migration through the structure. Equipment placement and sizing are calculated from this map.
Equipment placement is engineered based on the moisture map and assembly data — not placed by habit.
Daily readings, daily reporting, daily equipment adjustment if needed — documented throughout.
Completion is confirmed by instruments and documented in writing. No visual estimates.



"The most important thing about COS Water Damage Restoration's Union structural drying was that they explained the readings to me every single day. I understood what the numbers meant, what the target was, and how far we were from completion. By day six I was watching the moisture content readings in our wall framing drop from 28% to 11% and understood exactly what was happening and why. That level of transparency is what you need when your home is full of drying equipment for a week."
"The thermal imaging session at the beginning was what showed us the water had migrated into a wall cavity adjacent to the flooded room that we never would have found otherwise. COS Water Damage Restoration set up wall cavity drying for that section specifically, and the final readings confirmed it came out completely dry alongside everything else. That's the kind of detail that prevents the mold problem three months later."
"We manage several Union commercial properties and structural drying after water events is something we deal with periodically. COS Water Damage Restoration is the only company we use because of their documentation process. Zone-specific readings, daily logs we can review from our office, and a written drying completion report at the end of every project. When a tenant asks for proof that remediation was complete, we have an instrument-confirmed document, not a technician's verbal assurance."
COS Water Damage Restoration's Union structural drying team serves Union and surrounding communities throughout ME. Daily monitoring included. Call +1-844-499-0972 to get started.
Structural drying that's done when it looks done leads to mold. Structural drying that's done when the readings confirm it leads to a genuinely recovered property. Call +1-844-499-0972 and our Union drying crew brings the instruments and the protocol.
📞 Call +1-844-499-0972 — Union Structural Drying24/7 Available · IICRC WRT Certified · Daily Readings · Union, ME